Caia – Nacala Transmission Project

The objective of the project is to identify the least-cost development option for the transmission system from Caia to Nampula and Nacala with a total line length of 750 km, and to elaborate a Bankable Feasibility Report for the reinforcement of the existing 220 kV system from Caia to Nampula and for the extension of this system up to Nacala.
Project name:
Caia – Nacala Transmission Project
Client:
Electricidade de Moçambique (EdM)
Location:
Mozambique
Time span:
2012-2013

Once implemented, the new transmission facilities are expected to support the development of the power sector in the Northern Region of Mozambique on medium to long term. To achieve the objectives of the study and meet the demand requirements the transmission system will be at 400 kV and 220 kV.

Services Rendered:

  • Demand Forecast
  • Environmental and Social Impact Assessment
  • Preliminary Line Route
  • Preliminary Design
  • Technical-Economic Optimisation of the Grid
  • Economic and Financial Analysis
  • Bankable Feasibility Study
  • Training of Client's personnel.